There is no single month that covers every plug-in item in Australia.
AS/NZS 3760, in-service safety inspection and testing of electrical equipment, changes the suggested interval with the environment and with how hard the gear is used. The shapes people use in practice are these. Construction and demolition sites are commonly about three months. Workshops and factories, where leads are flexed or equipment is knocked, are often about six months. Hostile conditions, with heat, moisture or damage as part of the job, are often about twelve months. A settled office, where a cord stays put, can be several years. Hire equipment is looked at in connection with each hire, not left for a calendar reminder.
Those figures are guidance for the environment. They are not a slogan, and they are not legal advice. The regulator still depends on the state: WorkSafe Victoria, SafeWork SA, WorkSafe WA or SafeWork NSW. Read the guide on obligations by state before you treat a number as a rule.
What a useful register stores is the interval basis, the test date and the next due date. A failed item is tagged and handed over. It is not repaired as part of the test.
If the workplace is in Riddells Creek, Sunbury or Gisborne, that is the local run. A construction site and an office in the same town can still have different intervals. Say which one you have when you ask for a visit.